Commercial

One Commercial Plaza
Hartford, Connecticut

Year Work
1980 New Building
1983 Vault Loading
  9th Floor
  Pedestrian Bridge
  Electrical Duct Riser Hole
1984 IBM Floor Holes
  First National Bank Review and Reinforcing
  Chase Enterprises
  Loading Dock Slab
  Antenna Frame
  First National Bank Sign
  Antenna Support
  Storage and Offices Loading Dock
  6th Floor Holes
1985 Bookcase Inspection
  File Loading
  Floor Load Review for Canopy Equipment
  4th Floor Loading Review
1986 GSA Office
  Advest
  Floor Load Review for Forklift
  Floor Framing Review for Stair Opening
  Floor Load Review for 10th Floor
  IBM Rooftop Equipment
  Floor Load Review
1987 25th Floor Load Review
  Floor Trenches for Conduit
  Rooftop Microwave Buildings
  Analysis for IBM Antenna
  25th Floor Slab Penetration
  Heat Exchangers
  2nd and 3rd Floor Loading
  4th Floor IBM Fork Truck Study
  Parking Garage Shoring
  Proposed 4th Floor Scaffolding
  Parking Garage Wall Penetration
1988 2nd Floor Rolling File Review
  Ground Floor Load Review
  21st Floor Loading Review
  New 6' Dish to Existing Pole
  Existing Pole for New Dish Review
  Precast Concrete Inspection
  Rooftop Antenna for IBM
  Slab Penetration Review
1989 Settlement Vs. Piping
1990 Antenna Pole
  Satellite and Antenna Tower
  Metal Shed Penetrations
  Advest Floor Holes
  Garage Load Study Vs. Crane
  Arcade Shop Floor Penetration
  Floor Load Review
1991 Antenna Dish Support
  Stair Tower Inspection
1994 Tower
1995 15th and 16th Floor
2002 25th-29th Floors
2003 27th-29th Floors
  Proposed Stairway 27th to 29th Floors
  Floor Loading
2006 New Stairway